
EUREX is a mixed bed filter (MBC)
EUREX is a mixed bed filter (MBC) demineralizer unit consisting of a mixture of cation and anion exchange resin. When passing through the ion exchange material, the dissolved salts of the water are exchanged with hydrogen ions and hydroxyl ions, which combine to form water.
We take care of the regeneration
Regeneration is carried out at the ECOMAX plant. This way you avoid storing and handling chemical reagents. The filter is sent for regeneration when the capacity is exhausted and replaced with a new filter with regenerated ion exchange resin - and you're done.
Application
EUREX can be used to polish demineralized water until it reaches a low conductivity. EUREX is also used as a backup demineralizer after EDI in case of a failure.
Why choose the EUREX system?
Easy regeneration
When the conductivity is too high for the application or the capacity of the ion exchangers is exhausted, EUREX needs to be replaced in a few simple steps:
- Drain the water from the filter.
- Return the used filter to your local ECOMAX department for regeneration.
- Insert the new regenerated filter
- Open the valves and access the demineralized water
The robust transport frame ensures ease of use when replacing EUREX. To ensure a continuous supply of demineralized water, we recommend having an additional EUREX as a backup.

Product Overview
The EUREX system consists of the EUREX and EUREX-H series. Please contact us for more information on specific modules.
EUREX
| Max. flow: | from 700 to 4000 l/h |
| Working pressure: | 6 bar |
| Electrical conductivity: | 0-20 μS/cm |
| Performance: | from 37,800 to 756,000 l °GH |
| Transport weight: | 70-925 kg. |

EUREX-H
| Max. flow: | from 2700 to 14,000 l/h |
| Working pressure: | 6 bar |
| Conductivity: | 0-20 μS/cm |
| Productivity: | from 145,800 to 756,000 l °GH |
| Transport weight: | 200-925 kg. |

Options
Operating unit for ease of use
Connections: DN 25/32 mm
The control unit consists of a PVC valve system and a conductometer that continuously measures electrical conductivity. The unit is easy to install, and the valve system facilitates connection / disconnection of the tank.

Backup demineralization after EDI
In a CHP plant, water quality is critical to ensure reliable operation. EUREX is part of the water treatment solution as a back-up demineralization after EDI.
If a power failure affects EDI, the EUREX unit is activated and ensures that the problem does not affect the water quality.
Polishing Demineralized Water
EUREX can be used to polish demineralized water to achieve lower conductivity. The picture shows EUREX used in a chemical manufacturing company. Water quality is a key factor in the quality of the final product.
Get quality demineralized water
EUREX provides you with high-quality demineralized water - and we regenerate it. Our experienced team of sales and service engineers is ready to help you get started.
